We have laid out a list of key actions (listed by OPR and suspense date, as appropriate) to implement this plan.
Listed below is a set of near-term AFSPC staff actions necessary to carry out the Integrated Phased Implementation Plan addressed in Chapter 6 and to continue improving our planning process.
AI #01 |
HQ AFSPC/XP |
Track implementation status of this Action Plan and provide a semi-annual report to AFSPC directorates. |
AI #02 |
HQ AFSPC/XP |
In concert with the Mission Teams, SMC, ESC and AFRL, build a coordinated advocacy story and “marketing plan” (i.e., strategy) for gaining Air Staff, OSD, OJCS and Congressional support for FY02-07 POM initiatives in this plan (Suspense: 01 Dec 99) |
AI #03 |
HQ AFSPC/XP |
Sponsor a process for updating the AFSPC Vision and Commander’s intent and document front-end guidance for the 2000-2001 IPP cycle (Suspense: 01 Jan 00) |
AI #04 |
HQ
AFSPC/XP |
Evaluate the proposed AFSPC FY02-07 POM with respect to this SMP, providing assessment results at AFSPC PRC and Council meetings, prior to formal submission to Air Staff (Suspense: Prior to POM submittal) |
AI #05 |
HQ AFSPC/XP |
Monitor status of the evolving developments and initiatives contained in Appendix B and provide status/results summaries to Mission Teams prior to each phase of the 2000-2001 IPP (Suspense: Per 2000-2001 IPP schedule) |
AI #06 |
HQ AFSPC/XP
|
Institute a measurement program to track how well this plan is implemented in the AFSPC POM, FINPLAN and Requirements Generation System (Suspense: 01 Mar 00) |
AI #07 |
HQ AFSPC/XP |
Work with AFRL, SMC and ESC to develop technology roadmaps (with acquisition transition milestones) for the capabilities reflected on the far-term prioritized list. (Suspense: Prior to 2000 MSA) |
AI #08 |
HQ AFSPC/DR |
Prepare a Requirements documentation development schedule to meet the MNS and ORD milestones reflected in the Requirements and CONOPS Roadmap. (Suspense: 01 Jul 00) |
AI #09 |
HQ AFSPC/DO |
Prepare a CONOPS documentation development schedule to meet the CONOPS milestones reflected in the Requirements and CONOPS Roadmap. (Suspense: 01 Jul 00) |